The SPE Workshop: Tight Gas-Maximising ROI by Completing Wells Unconventionally 2017 is a workshop that covers topics such as:
- Hard rock drilling innovations to reduce wellbore construction costs
- Innovative deep drilling technologies
- A combination of horizontal well architecture and hydraulic fracturing to achieve this contact area
- Massive well to reservoir contact areas in order to achieve economic production rates
- Maximising economic returns through effective use of innovative surveillance techniques
- Early gas monetisation through advanced sweet spot identification techniques
The SPE Workshop: Tight Gas-Maximising ROI by Completing Wells Unconventionally 2017 brings together:
- Petroleum Engineers
- Drilling Engineers
- Geologists
- Reservoir Engineers
- Petrophysicists
- Geophysicists
- Decision Makers