Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4 2016

  • 08 Jun 2016
  • Webinar

Description

Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4 2016 is a webinar that covers topics such as:

  • The operating characteristic curve, and the points (AQL, 1-alpha) and (RQL, beta) where the second item is the chance of acceptance. (An ANSI/ASQ Z1.4 plan does not have a specified RQL, but we must determine one based on beta = 0.10, which is tabulated in the standard, so we can create the sequential plan)
  • Specification and selection of an ANSI/ASQ Z1.4 sampling plan
  • Demonstration that the sequential plan provides comparable protection from poor quality, and in fact identical protection at (RQL, beta)
  • Determination and tabulation, in a very convenient format, of a sequential sampling plan
  • Application of the ANSI/ASQ Z1.4 switching rules
  • Average sample number (ASN), the number of items we expect to have to inspect to decide whether to accept or reject the lot

Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4 2016 is intended for attendees from:

  • All manufacturing industries that use ANSI/ASQ Z1.4
  • Quality managers, engineers, and technicians

Past Events

Important

Please, check "Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4" official website for possible changes, before making any traveling arrangements

Event Categories

Business: Quality assurance
Industry: Construction & Building, Energy & Utilities
Technology: Industrial technology

Other Events with Similar Categories

Other Events with Similar Location or Organizer

Featured Conferences & Exhibitions