Completion and Well Intervention (C&WI) for Non-Specialists 2015

  • 27-29 Apr 2015
  • Kuala Lumpur, Malaysia

Description

Completion and Well Intervention (C&WI) for Non-Specialists 2015 is a workshop that covers topics such as:

  • How to connect the reservoir to the production facilities
  • Exploration activities
  • How to have access to the reservoir from the well bore
  • Well structure and well conduit
  • Artificial lift completions, and other production issues
  • Sand control measures and recovery methods
  • Pumping operations, annulus integrity testing and well head maintenance
  • Intervention technologies such as coil tubing, slickline, electric wireline, snubbing unit etc

Completion and Well Intervention (C&WI) for Non-Specialists 2015 brings together attendees :

  • Production operations engineers
  • Staff for instance in the HSE discipline, Procurement, Finance and HR are all exposed to C&WI terminology that does not necessarily make sense to them. Developing their skill level on this subject will enhance their functioning and improve performance knowing what it is about. Other relevant job titles include:
  • Operation engineers
  • Young graduates in production technology
  • Reservoir engineers
  • Operational HSE advisors
  • Finance staff involved in the accounting and cost allocation activities of the C&WI team
  • Fresh well services engineers

Past Events

Important

Please, check "Completion and Well Intervention (C&WI) for Non-Specialists" official website for possible changes, before making any traveling arrangements

Event Categories

Industry: Energy & Utilities, Natural resources
Science: Engineering

Other Events with Similar Categories

Other Events with Similar Location or Organizer

Featured Conferences & Exhibitions