Zero Acceptance Sampling to Reduce Inspection Costs

Zero Acceptance Sampling to Reduce Inspection Costs is a webinar that covers topics such as:

  • The benefits of double and multiple inspection plans in terms of their ability to accept good lots very quickly, and reject bad ones quickly, to reduce the average sample size
  • How to use ANSI/ASQ Z1.4, including definition of the sampling plan based on the inspection level, acceptable quality level (AQL), and lot size
  • Converting any ANSI/ASQ Z1.4 plan into a zero acceptance number (c=0) plan that provides equivalent or better protection against poor quality at the rejectable quality level (RQL). (ANSI/ASQ Z1.4 plans do not have formal RQLs, but we pretend that the nonconforming fraction for which the consumer’s risk of acceptance is 10% is the RQL). A c=0 plan has a smaller sample size than any single, double, multiple, or sequential sampling plan

Zero Acceptance Sampling to Reduce Inspection Costs is intended for:

  • Quality Inspectors
  • Quality Managers
  • Quality Engineers
  • Quality Technicians
  • Engineering Departments

Find Similar Events by Category